Port Zayed Development for reconstructing berths, and dredging in 1999 and 2000
All reclamation works were handled by Al Rafeh.
Machines used:
Machines used:
- 2 X D8R LGP
- 2 X D6R LGP
- 2 X 980 Wheel Loader
- 2 X 330 Excavators
- 2 X 345 Excavators