Port Zayed Development for reconstructing berths, and dredging in 1999 - 2000 Port Zayed Development for reconstructing berths, and dredging in 1999 - 2000 Port Zayed Development for reconstructing berths, and dredging in 1999 - 2000
Port Zayed Development for reconstructing berths, and dredging in 1999 - 2000
Port Zayed Development for reconstructing berths, and dredging in 1999 - 2000
-

Port Zayed Development for reconstructing berths, and dredging in 1999 - 2000
All reclamation works were 
handled by Al Rafeh and 
used the following machines:
01. 2 X D8R LGP
02. 2 X D6R LGP
03. 2 X 980 Wheel Loader
04. 2 X 330 Excavators
05. 2 X 345 Excavators

Back To Projects